Luggage MOQ: Why 300 Pieces Is the Default
Almost every Chinese luggage factory publishes an MOQ between 100 and 1,000 pieces. We publish 20. Here is the actual market data, and what the gap means for a first order.
What factories actually publish
We searched for aluminium and hard-shell luggage manufacturers on the English-language web and recorded the minimum order quantity each one states on its own site. This is what we found in November 2026.
| Supplier type | Published MOQ | What it applies to |
|---|---|---|
| Aluminum-magnesium factory, Dongguan | 100 pcs | Per size, per model |
| Aluminum luggage factory, Dongguan | 300 pcs | Per model |
| Aluminum and Al-Mg factory, Dongguan | 300 pcs | Per model; logo from 50 pcs |
| PC and PC+ABS hard-shell factory | 100 pcs | Per size |
| Industry MOQ survey (2026) | 300 – 1,000 pcs | Hard-shell, stated as the realistic range |
| TROVELA | 20 pcs | Per SKU, mixed models in one order |
Read that table as a price signal, not a quality signal. A factory that will run 100 pieces per size is running a changeover for every single size in your order, and the changeover has to be paid for somewhere.
Where the number comes from
In most consumer goods, MOQ is set by the mould or the print run — a fixed cost you amortise over units. Luggage is different in two specific ways.
The first is changeover time on the frame line. A riveted aluminum frame is assembled on a jig set to a specific case size. Swapping the jig is not hard, but the line stops while it happens, and the operator has to re-check the rivet pitch before the first good unit comes off. That dead time is the real cost, and it is why a factory with two frame stations can price 100 pieces per size and a factory with one cannot.
The second is the shell material. Polycarbonate sheet is bought by the roll or by the tonne, in a fixed colour. If you want 100 pieces in a colour the mill does not stock, you are buying enough sheet for a much larger run and the surplus goes into the factory's inventory — or into your quote. This is why PC MOQ sits higher than aluminum at almost every factory, including ours.
What a 20-piece MOQ actually buys you
Twenty pieces is not a marketing number. It is the point where our own line changeover cost per unit still sits below the margin on the goods — which is the same calculation every other factory is doing, just at a different scale because we run a narrower range. We do not offer 5-piece MOQ, and you should be suspicious of anyone who does: either they are selling stock they already hold, or there is a surcharge in the quote they have not itemised.
What 20 pieces is good for is a market test with a real end date. Concrete version: 20–40 pieces across three SKUs, air-freighted, in your hands in about 20 days. You put them into your two best channels at three price points and watch which one turns. Then you place a mixed container on the winner.
What 20 pieces is not good for is a container economics play. At 20 pieces the per-unit freight is more than double what it is on a 40HQ, because you are shipping air. The trial is expensive per unit by design — you are buying information, not margin.
A trial order is a market test with a defined end date, not a discount negotiation. Decide before the goods land what sell-through number makes you reorder, and hold yourself to it.
Why some factories will not quote 20
If you approach an aluminum luggage factory running 300-piece minimums and ask for 20, you will usually get one of three answers: a refusal, a quote with a small-order surcharge, or a very long lead time. All three are honest. The refusal means the changeover genuinely does not pay. The surcharge is the changeover, itemised. The long lead time means your order gets scheduled around a bigger one, which is a real risk you should price in.
The answer that should worry you is an immediate yes at the same unit price as a container order. That means the number was never derived from the line at all.
How to compare two quotes at different MOQs
Strip the freight out and compare landed cost per unit at the same volume. A supplier quoting a 300-piece MOQ will often give a better unit price at 300 than a 20-piece supplier will — that is expected and does not make them cheaper for your situation. The question is what your first order costs to find out whether the model sells at all. Before any of that, though, you need to know you are comparing two real factories rather than a factory and a trader, which is what the 20-minute factory verification is for.
| Scenario | Cash at risk | Time to market feedback |
|---|---|---|
| 300 pcs, one model | Highest | 45–60 days |
| 100 pcs, one model | Mid | 35–45 days |
| 20 pcs × 3 models, air | Lowest | About 20 days |
For a buyer who already knows the model sells in their market, the 300-piece order is correct and cheaper. For a buyer testing a new price point, a new country or a new channel, the trial is correct. Most first orders we see are the second case, and most of them are placed as if they were the first.
The one thing MOQ does not change
A lower MOQ does not mean a lower specification. Ours is the same shell, the same frame, the same rivet pitch and the same lock at 20 pieces as at 2,000 — because we do not offer customisation, so there is only one build to run. That is the trade: you cannot put your logo on it, and in exchange the 20th unit is the same as the 20,000th.
What that specification actually consists of is set out on the 1:1 specification page, and the two components buyers most often get wrong at any MOQ are covered in lock and frame closure and handle geometry.